Amendments to MARPOL Annex VI had Entered into Force
Amendments to MARPOL Annex VI had entered into force on 1 November 2022. At the first IAPP Annual Survey after 1 January 2023 it will
Amendments to MARPOL Annex VI had entered into force on 1 November 2022. At the first IAPP Annual Survey after 1 January 2023 it will
Problem: Using a self-contained offshore Wind Turbine Installation Vessel (WTIV) is the preferred method of installation for the main component’s turbine (Tower, Nacelles and Blades).
NETSCo
11700 Station Road
Columbia Station, OH 44028
USA
p: 440 236 9191
f: 440 236 9188
NETSCo
1120 E. Kennedy Blvd, Suite 230
Tampa, FL 33602
USA
p: 813 223 5464
© 2024 Northeast Technical Services Co., Inc. (NETSCo) | Site by nurenu