Amendments to MARPOL Annex VI had Entered into Force
Amendments to MARPOL Annex VI had entered into force on 1 November 2022. At the first IAPP Annual Survey after 1 January 2023 it will
Amendments to MARPOL Annex VI had entered into force on 1 November 2022. At the first IAPP Annual Survey after 1 January 2023 it will
Problem: Using a self-contained offshore Wind Turbine Installation Vessel (WTIV) is the preferred method of installation for the main component’s turbine (Tower, Nacelles and Blades).